The Divisional Engineer (Highways) at Projects, Old Nattanmai Kazhaga Building Campus, Salem, is overseeing the construction of a Grade Separator at Km.1/8 of the Erode - Perundurai - Kangeyam Road, near the Government Hospital Junction. Additionally, a sub-work involves the construction of a Box Culvert between Abutment Piers AP4 & AP5 (GH arm) on the Erode Dharapuram road (SH 83A). These infrastructure developments are crucial for improving traffic flow and connectivity in the Erode region.
Bridge length
Span - 24m - 15 Nos (Two lane - 12m Wide)
Span - 24m - 3 Nos (Single lane - 6.5m Wide)
Tamil Nadu Highways
2017-2019
19.02
@ 2024 Renaatus Projects Pvt Ltd. All rights reserved. | Sitemap